top of page
Freshwater Village - Leisure and Activity.jpg

Shed 3 Construction Update

Updated: Jun 29, 2023

Works continue on Shed 3 at The Sheds at Brendale, despite the weather causing delays, with the structure now completely bare and painted in readiness for the new exterior walls.

Wattle Run The Sheds at Brendale Shed 3 Construction Roof

The refurbishment, undertaken by Urban Insight Constructions, is starting to take shape with the interior steel frame painted in the popular Monument Grey to replace the previous blue.

The exposed steel frame will be a feature of the redevelopment retaining the original gantry rail system in its structure, which once held a crane that would do all the heavy lifting.

Wattle Run The Sheds at Brendale Shed 3 Construction Wall

The steel work will be on site this week and the new cladding will be placed onto the building in mid-June, transforming the entire building.


Once the roof has been completed, the design for the solar panels will be finalised further emphasising the importance of a green footprint at The Sheds.

Wattle Run The Sheds at Brendale Shed 3 Outside

The outside beer garden has been levelled in preparation for some incredible mosaic stonework and recycled brick features that will adorn the floors adding to the aesthetics and complimented by the lush garden planned.

Wattle Run The Sheds at Brendale Shed 3 Construction Outside Beer Garden

For more information, email contact@theshedsatbrendale.com or visit www.theshethisdthisdthiusthidsdsatbrendale.com


27 views0 comments

Recent Posts

See All
bottom of page